Laserfiche WebLink
22.) <br />Exhibit L - Reclamation Cost <br />23.) No overburden will be replaced. <br />24.) Mining will be above the ground water table, until we have water well permit to cover any losses of <br />water and the DRMS has been notified. <br />RECLAMATION COSTS <br /> <br />Replace Topsoil 5400 Cubic yard $1.00 $5400 <br />Scarify hard pan 10 Acres $25.00 $250 <br />Seed bed prep 10 Acres $25.00 $250 <br />Seeding & Seed 10 Acres $134.00 $1340 <br />Mulch 10 Acres $160.00 $1600 <br />Weed control 10 Acres $25.00 $250 <br />mobilization 1 Ea $1120.00 $1120 <br />Total <br />$10210 <br />25.) No ground water will be exposed until we have the correct permit (water well permit) and DRMS <br />has been notified and approved. <br />Exhibit M - Other permits and Licenses