Laserfiche WebLink
— ,;36328106 T 65T f.Op61Q07 f- 633::;: <br />- �AY-2010' 04: ?2PM FROM-DIV RECLAMATIOWMiNi" d. SAFETY <br />ww <br />May 18, 2010 <br />page 3 of 4 <br />is a reference area appropriate at <br />must include a proper success standard. it is our understanding that the landowner does at on their PrOPerW' <br />consent to,the use of a r use of a orract technical stan dard is recommended. <br />another location, so the <br />n Ian must include a commitment to saivagn d Pepr<' ®�farlmlandabte soli <br />3, The revised reclama P <br />ire that a ll Morgan Property materials must be salvaged and <br />and subsoil r� S ourCes. In accordance with the landowner's direction <br />requirements, DBMS must requ <br />returned to Morgan property <br />n Morgan Property. The use of <br />Ian must include a detailed material balance d o assessment of topsoil, subsoils <br />4, The reclamation p disturbed <br />and soli substitute materials d 1` dYa e g s must be max max imized for both the already <br />separately salvag ®d Lift A an <br />area n o for future operations. <br />for the Morgan property must be assessed to ensure that <br />5, The material balance and final grading iand, of irrigated cropland to be implemented in <br />final grading will allow the post Alining <br />accordance with the landowner's direction. <br />6. Al! sections of the permit must be reconciled to provide consistent content in compliance with all <br />requirements- I <br />lemented and <br />e fully and adequately addressed, as supp <br />7. Al! pending adequacy issues must b <br />modified by this letter• <br />8. All such plans M ust be coordinated with the landowners. Specific and affirmative documentation <br />of landowner consent must be Provided with the PRO6 response- <br />Practices were implemented on Morgan Property without <br />g. Given that soils management <br />• h the landowner, and given that such practices resulted in loss or damage to $oils <br />consultation wit vLn must coordinate directly with the landowner to <br />now known to be prime farmland sots, <br />omplaints and dispute regarding these soils. Affirmative <br />address and resolve the ongoing c <br />documentation of such resolution must be submitted. <br />Thank you for your immediate attention to these issues. <br />Sincerely, <br />4 Dav'erry <br />Director, Office of Mined Land Reclamation <br />CC: A[ Klein, GSM (w /o enclosures) <br />Jim" OSM (w /o enclosures) <br />JAEllen Turner (w /o enclosures) <br />