Laserfiche WebLink
-4- <br />12. Primarv future (Post-minine) land use (check one <br />1 Cropland(CR) _ Pasturcland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13 <br />Cropland(CR) <br />Rangeland(RL) <br />Residential(RS) " Recreation(RC) <br />Developed Water Resources(WR) <br />Pastureland(PL) <br />Forestry(FR) <br /> General Agriculture(GA) <br /> Wildlife Habitat(WL) <br /> Industrial/Commercial(IC) <br /> Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />II Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Extraction will occur using loaders and bulldozers <br />15. On Site Processing: V Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Dry land mining using loaders and bulldozers <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />No chemicals will be used or stored within the permit area <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Total permit acreage is increasing from 9.8 to 26.1 acres requiring a 112 Permit