My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-10_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2010-11-10_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:41 PM
Creation date
11/10/2010 4:36:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
11/10/2010
Doc Name
Items & Exhibits for FPH
From
JoEllen Turner & Michael Morgan
To
MLRB & WFC
Type & Sequence
PR6
Email Name
SB1
MLT
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 <br />Soil suitability criteria for all non prime farmland areas west of 2700 Road are addressed in <br />Table 2.05.4(2)(d) -1 B. These areas will be stripped and replaced in a single lift of mixed topsoil. <br />Depth measurements shall be taken at the same locations as the original sample sites. <br />Replacement depth information shall include thickness of Mixed. The topsoil salvage and <br />replacement depth information will be kept on file at the mine office and will be submitted with <br />the ° Annual Topsoil Balance /Spoil Quality Report Topsoil recovery depths will be adjusted if <br />warranted by the site conditions. Sample frequency is as shown in the table for each material <br />type: <br />15.0 Topsoil Remediation Plans <br />In the event that any one spoil sample result exceeds the limits, WFC will implement the topsoil <br />remediation plan below. <br />If one or more parameters fall within the unsuitable range at a given grid point, a three -part <br />Mitigation plan will be implemented. <br />1. The area around a suspect hole will be sampled on a closer spacing interval in order <br />to better define the lateral extent and variability of the unsuitable material. This <br />sampling will be called the 2 nd Phase sampling and the interval is one hole per 50 feet <br />distance around the bad point in all directions for prime farmland, and one hole per <br />100 feet distance around the bad point in all directions for reclaimed irrigated <br />pastureland and dryland pasture. <br />2. If 2 nd phase sampling shows an exceedence, follow -up sampling will take place to <br />delineate the area of exceedence. Delineated areas of exceedance that are larger <br />than 0.1 acres for prime farmland, 0.25 acres for reclaimed irrigated pastureland or <br />0.50 acres for dryland pasture will be remediated. <br />3. For remediation, any area identified above which excceds the acreages stipulated <br />above for unsuitable topsoil material will be placed at least eight feet below the final <br />Revised PR 06 June 10 2.05.4(2)(d) -46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.