Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />INTEROFFICE <br />MEMORANDUM <br />TO: Colowyo TR-88 File <br />FROM: Jim Star <br />SUBJECT: Approval of TR-88 <br />DATE: 9 November 2010 <br />COLORADO <br />D IV IS I ON Of <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />On 11 August 2010 Colowyo submitted technical Revision 88 to change the limits of the <br />West Taylor Fill. The revision was deemed incomplete on 20 August 2010. Colowyo <br />provided the materials required for completeness on 31 August 2010 and the Division <br />deemed the revision complete on 10 September 2010. <br />This revision only changes the limits of the West Taylor Fill and its configuration. It <br />does not change the maximum amount of overburden material that will be placed in the <br />fill. Colowyo provided Exhibit 21, Item 1 with TR-88, which is the engineering report <br />for the West Taylor Fill. This report was reviewed by the Division in conjunction with <br />Technical Revision 81 and found to be acceptable. The fill limits proposed in TR-88 are <br />the same as those reviewed with Exhibit 21, Item 1 in TR-81. Colowyo has "pulled out" <br />the fill limit change from TR-81 because they need to begin placing spoil on the fill pile <br />this fall. <br />The revision also contained SEDCAD modeling for the West Taylor Pond which contains <br />the new West Taylor Fill limits. The West Taylor Pond will be remodeled with the <br />changes contained in TR-81 (which includes the changes to the fill limits). Additionally. <br />the changes to the fill limits are minor and the amount of fill being placed on the pile has <br />not been increased. Because of the above reasons, it was determined that the existing <br />West Taylor Pond Model is acceptable. <br />The Division will propose a decision to approve Technical Revision 88. <br />cc: Sandy Brown <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines