Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Mine: New Elk <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />Pond #4 <br />Third Quarter 2010 <br />08/15/10 <br />General Description or Reference to Site Plan: <br />This sediment control pond lies west of the Development Waste Pile. The majority of <br />run-off from this waste pile flows to this pond. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: xcelle Moderate Few <br />2). Erosion forming Gullies: Extensive Some Few <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />4). Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Poor <br />Cone <br />Yes No <br />Yes No ?- <br />Yes No <br />Yes <br />No i/ <br />CDMR Rule 4.05.9(17) <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? Yes y <br />2). Is the inlet free of debris and restrictive material? Yes t/ <br />3). Is the discharge outlet free of restrictive material? Yes <br />4). Is erosion occurring at the discharge outlet? Yes r/ <br /> Evaluate the severity: Extensive oderate Just starting None <br />No <br />No <br />No <br />No <br />