Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Mine: Lorencito <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />Pond #9A (South) <br />Second Quarter 2010 <br />4/30/10 <br />General Description or Reference to Site Plan: <br />This pond is located south-east of the area of mining scheduled for 2001-02. The pond <br />is partially incised into bedrock and the embankment keyed into bedrock. Side slopes <br />are less than 2HAV. The primary spillway discharges south into Jeff Canyon. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Excellent oderate Few Poor 1 } <br />Extensive Some g e None <br />Yes No v <br />Yes No <br />4). Erosion of the downstream toe of the embankment? Yes No v <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No <br />Could this seepage cause potential instability? <br />CDMR Rule 4.05.9(17) <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and-restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes v No <br />Yes .? No <br />Yes ?.? No <br />Yes No <br />Just starting None <br />Page 1 of 2