Laserfiche WebLink
the ten stock tanks designed in the 1997-1999 time period as last updated under MR-51. Figure <br />2.05-6 has been revised as requested to show the off channel design. As this figure is intended <br />to show the general design requirements, the specific inlet and outlet routing is for the five stock <br />tanks proposed within the Prospect drainage is separately provided on Exh. 7-14R, Figure 8. <br />This concludes Colowyo's review of the Division's PAR for Technical Revision 87. <br />Should you have any questions or require additional information, please feel free to <br />contact me at (970) 824-1578. <br />Sincerely, <br />Ryan Pawlowski <br />Environmental Engineer <br />Encl. 3 copies <br />Cc: file CF 1.1.2.76 <br />Colowyo Coal Company, L.P. • 5731 State Highway 13 • Meeker, CO 81641 <br />T + 1 970 824 1578 • F +1 970 824 1598 • http://prospect.riotinto.org/irj/portal