Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 002 State : Colorado Permit/job# : C-1982-056 <br />Date : 1110312010 County : Routt Abbreviation : none <br />User : JDM Site : Foidel Creek Mine Filename : C056-002 <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action : TR76 <br />Task description :Replace Topsoil on Ditch G-6 Extension <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D3G XL - 3P Horsepower : 70 <br />Blade type : Power Angle Tilt <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Uata source : ((;Ku) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $12.82 NA <br /> Operating cost/hour : $18.90 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $70.26 Total fleet cost/hour : $70.26 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 133 LCY factor : NA volume : 133 LCY <br /> <br />Source of estimated volume: 450'X8' <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 169.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Loose stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,100 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (PA 7) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.86 <br />Weight description <br />Top Soil Adjusted unit production : 145.64 LCY/hr <br /> Adjusted fleet production : 145.64 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 0.91 Hours <br />Unit cost : $0.482 /LCY Total job cost : $64 <br />