Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 03-Nov-2010 Permit or job no. C-1982-056 Site : Foidel Creek Mine <br />User : JDM Abbreviation : none State : Colorado <br />Filename : C056-000 County : Routt <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or job action : TR76 <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Backfill and Regrade Ditch G-6 Extension dozer 1 3.2 $231 <br />002 -Replace Topsoil on Ditch G-6 Extension dozer 1 0.91 $64 <br />003 -Reseed Ditch G-6 Extension revege 1 0.3 $274 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 4.4 $569 <br />' includes inflation factor adjustment of : NA % TOTAL DIRECT COST' =I $569 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $11 <br />Performance bond : 1.05 % of direct total = $6 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $57 <br />• not required (or eqp. operator serves as super.) TOTAL O & P = $74 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $643 <br />Financial warranty processing (legal/related costs) : NA NA NA total = $0 <br />Engineering work and/or contract/bid preparation : 4.25 % of cntr. NA total = $27 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $32 <br />CONTINGENCY - NA' NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $134 <br /> TOTAL BO ND AMOUNT (direct + indirect) _ $703 <br />