My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-28_REPORT - M1977410
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977410
>
2010-10-28_REPORT - M1977410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:29:28 AM
Creation date
11/9/2010 7:23:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977410
IBM Index Class Name
REPORT
Doc Date
10/28/2010
Doc Name
Annual Fee/Report/Map
From
Calais Resources Colorado, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 o?m ,?; ? F,4Q o <br />a als???????????4 esources <br />o mr- s ?? Silver Exploration <br />October 22, 2010 <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Reference: Annual Report and Fee's for Permit # M -1977-410 <br />Cross Gold Mine / Caribou, Colorado - Boulder, County <br />Written Annual Report + Payment <br />Dear DRMS: <br />Please find enclosed our check for $ 259.00 dated October 28, 2010, for our <br />annual permit fees. <br />The permit year November 04, 2009 through November 03, 2010 continued to be <br />a busy year for us at the Cross Mine operation. Numerous projects were completed <br />in preparation for our new mine expansion and startup planned for early 2011. <br />1. The Cross Mine office remained open all year round. <br />2. Full access to the mine was maintained through out the winter months. <br />3. The Cross Mine road from County Road 128 was rebuilt using our D8 Cat <br />and A 66 3 yard loader. This included ditch work to maintain our Storm <br />water permit in full compliance. <br />4. The Cross Mine and Caribou mine water discharge systems were maintained <br />on a seven day per week basis + 365 days for the year. This included daily <br />lime activity at the Cross, flow measurements, pH testing, sampling, weir <br />measurements in the upper Coon Track creek basin and visual observations. <br />Improvement work was completed on our 8 inch discharge pipe and pond <br />number two dam. This included concrete work and dike work. A significant <br />amount of reporting work was completed on time to the CDH and EPA on <br />our water systems. We continued to use Walsh Environmental Engineers to <br />complete the quarterly DMR's and statistical filing work. <br />5. Storm water permit work was completed as required and logged into our file <br />systems. Our new air quality permit was kept current. <br />6. Work continued on the portal / snow shed timbering project. Old timbers <br />from the 1970's were replaced with new # 1 Douglas fir 6 x 6 and 8 x 8 posts <br />and caps. Estimates were made to replace two five foot sections of our portal <br />sets at the contact with the alluvial ground and the bedrock interface. <br />7. Work continued on improvements to our tunnel level secondary escape way. <br />A study was completed to cost the improvements required to complete the <br />replacement of the top surface timber sets and snow cover / closure doorway. <br />8. Underground rail mining equipment was brought to the surface shop for <br />rehabilitation and maintenance work. <br />P.0. Box 653 - Caribou - Nederland, CO 80466-0653 Phone 303.258.3806 • Fax 303.258.0402 <br />Emailothomassh@earthlink.net a
The URL can be used to link to this page
Your browser does not support the video tag.