My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-08_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-11-08_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:37 PM
Creation date
11/8/2010 2:23:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
11/8/2010
Doc Name
Response to Preliminary Adequacy Review
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR84
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo's Response: <br />These trials will be monitored and reported in the same manner as any other <br />reclaimed area through interim revegetation monitoring and reporting in the Annual <br />Reclamation Report. The text has been amended to reflect this practice. <br />21. Finally, the Division will approve the field trial proposal, only with the condition <br />that larger scale plantings will be incorporated into the reclamation plan for the <br />South Taylor area, based on results observed and documented in the field trials. <br />Please provide amended narrative within TR-84, which commits to final reporting <br />and assessment of field trial results no later than the end of 2016, and commits to <br />incorporation of thick soil and thin soil aspen and tall shrub planting sites into the <br />permit for implementation in the South Taylor area, no later than the end of 2017. <br />The amended narrative will need to confirm that the aspen and tall shrub plantings <br />will be conducted in accordance with the provisions outlined in Stipulation 13, <br />subject to modification based on assessment of field trial results by CDRMS and <br />CDOW. If Colowyo provides such commitment in the amended narrative, the <br />Division will revise the time frames of Stipulation 13 accordingly, and will <br />further revise Stipulation 13 to reference potential future modification of the <br />aspen and tall shrub planting plans based on field trial results. <br />Colowyo's .Response: <br />The appropriate text has been amended. <br />This concludes the preliminary adequacy review for the Colowyo Mine's Technical <br />Revision 84. The proposed decision date for this revision is 22 June 2010. The Division <br />requests Colowyo's responses no later than 1 June 2010. Please call me at (303) 866- <br />3567 X8145 with any questions. <br />Please contact me should you have any questions or concerns at 970-824-1531. <br />Wncer <br />,Bunt <br />Environmental Supervisor <br />cc: File
The URL can be used to link to this page
Your browser does not support the video tag.