My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-04_REPORT - M2005071
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2005071
>
2010-11-04_REPORT - M2005071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:29:29 AM
Creation date
11/8/2010 1:18:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005071
IBM Index Class Name
REPORT
Doc Date
11/4/2010
Doc Name
Annual Fee/Report/Map
From
Benson Brothera
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notice of Intent to eontinue'Mining Operations <br />' 112C?-Conet rust ion Materials Annual ReQort <br />Tcrzn.ittee Name: BenyQn..J3rgthsre Benson Brothers Red Shbile Pit <br />PeVl,mit No. : . M-2005-071 <br />OPCIZATIOM tJAPtE: <br />Amivereary Date: <br />Total: (Due on your Anniversary Date) <br />1• a, Permitted acreage; 30, <br />b. County where mine is located: <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES ?Nq,/ <br />Does this mine operate MORE or LESS than 180 days per year? MORE ESS?' <br />3. Does this mine have a phased reclamation plan? YES r:""' <br />4. Total acres affected during the report year;*_ <br />5. Total acres reclaimed for the report year:* Q <br />61 Total number of acres in topsoil replacement stage: O <br />A. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: --- Al <br />a. List species seeded & seeding rate for report year on tlak <br />e. For non-phased operations provide dates extraction ceased. N/A <br />a. Date reclamation began; <br />9. The type and approximate quantity of fertilizers, organic m terial or soil <br />conditioners used for the report yeariv <br />lo. Estimated total acres .;9 be affected in the next report year;* <br />11. COMMENTS; <br />• Please show the location of the acreage for items 4 - 6 on your map* •, Indicate <br />the phases of the reclamation which have been completed, correlated-with your timetab:e. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />. • NOTEt If there have not been any changes 'since the last annual report and you <br />Nreviously submitted a map which correctly depicts the current acreage in items 2 <br />5, then a new map is unnecessary, }?nvever, this must be stated above. <br />Signature: Date: )lease type or print current contact name, mailing address, and phone number below: <br />.ontact Name; Phone; (97D F3,97- 3JZ 92 <br />,ompany; FAX NO; ( 970 •) 835-05G <br />%ddress; ?7/??/O LLS`tf?/? /?GY, <br />A.z-5'74 A,1 CZ,) fs / 5?/3 <br />'ederal Tax ID No. or Social Security
The URL can be used to link to this page
Your browser does not support the video tag.