Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ WESTERN FUELS - Permit C-008-81 Field Visit 10/05/2010 Continuation Page <br />Person Number Date <br />28. Performance Standard-Cate gories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, 5=Noncompliance Identified Elsewhere, 6=Previously Cited <br />IA. <br />IB. <br />C. <br />Administrative <br />1. 1 Mining within Valid Permit <br />2. 1 Mining within Bonded Area <br />3. 1 Terms & Conditions of Permit <br />4. 1 Liability Insurance <br />5. 1 Ownership and Control <br />6, Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. - <br />_ AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance . <br />1. 1 Drainage Control <br />2. 1 Inspections & Certifications <br />3. 1 Siltation Structures <br />4. 1 Discharge Structures <br />5. 1 Diversions <br />6. Effluent Limits <br />7. Ground Water Monitoring <br />8. Surface Water Monitoring <br />9. Drainage -- Acid-Toxic Materials <br />10. 1 Impoundments <br />11. Stream Buffer Zones <br />Topsoil & Subsoil <br />1. 1 Removal <br />2. 1 Substitute Materials <br />3. 1 Storage and Protection <br />D. Backfilling & Grading Subsidence Control Plan <br />H. <br />1. Exposed Openings - <br />I. Roads <br />2. 1 Contemporaneous Reclamation 1. 1 Road Construction <br />3. - Approximate Original Contour 2. Certification <br />4. Highwall Elimination 3. Drainage <br />5. Steep Slopes (includes downslope) 4. 1 Surfacing and Maintenance <br />6. Handling of Acid & Toxic Materials g, 1 Reclamation <br />7. Stabilization (rills and gullies) J. Signs & Markers <br />E. Excess Spoil Disposal 1. 1 Sims <br />1. - Placement 2. 1 Markers <br />2. - Drainage Control K. 1 Distance Prohibitions <br />3. Surface Stabilization etation <br />L. Reve <br />4. _ Inspections & Certifications g <br />1. Vegetative Cover <br />F. Coal Mine Waste 2. Timing <br />(Refuse Piles/Impoundments) <br />1 _ M. Postminin; Land Use <br />1. Drainage Control - <br />2. 1 Surface Stabilization N. Other <br />3. 1 Placement General <br />4. Inspections and Certifications Performan ce <br />5. Impounding Structures Catagory <br />G. Us e Of Explosives 1) <br />1. Blaster Certification - _ <br />2. _ Distance Prohibitions 2) <br />3. _ Blast Survey/Schedule - _ <br />4. _ Warnings & Records _ ) <br />5. Control of Adverse Effects - <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br />A. Administrative ................................. ........................................ <br />1. Valid Permit ................................................... ..................................773.11 <br />2. Mining within Bonded Area ................ ...............................773.11 <br />3. Terms & Conditions of Permit .............................................773.17 <br />4. Liability Insurance ................................. ...............................800.60 <br />5. Ownership and Control .......................... ..............................778.13 <br />6. Temporary Cessation ..........:.................. .842.11(e) & 816/817.131 <br />7. AML Rec. Fees - Non-Respondant ....... .........................870.15(b) <br />8. AML Rec. Fees -- Failure to Pay ........... ..........................870.15(a) <br />Hydrologic Balance ......................................(816/817.41-57) <br />B <br />. <br />1. Drainage Control .................................... .....................................45 <br />2. Inspections & Certifications .................. ...........................49(a)(10) <br />3. Siltation Structures ................................ ......................................46 <br />4. Discharge Structures ............................. ......................................47 <br />5. Diversions .............................................. .....................................43 <br />6. Effluent Limits ....................................... .....................................42 <br />7. Ground Water Monitoring ..................... .................................41(c) <br />8. Surface Water Monitoring ..................... .................................41(e) <br />9. Drainage--Acid - Toxic Materials .......... .................................41(0 <br />10. Impoundments ....................................... .....................................49 <br />11. Stream Buffer Zones .............................. .....................................57 <br />C. Topsoil & Subsoil .............................. .................(816/817.22) <br />1. Removal ................................................. .................................22(a) <br />2. Substitute Materials ................................ ..........:.....................22(c) <br />3. Storage and Protection ............................ .................................22(c) <br />4. Redistribution ......................................... .................................22(d) <br />E. Excess Spoil Disposal ...........................................(816/817.71-74) <br />1. Placement ...........................................................................................71(e) <br />2. Drainage Control ................................................................................71(f) <br />3. Surface Stabilization .............................................:. ............................71(g). <br />4. Inspections & Certifications .................................... ...........................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,(816/817.81-84) <br />1. Drainage Control ................................................... ...................:...... 83(a) <br />2. Surface Stabilization ............................................... ...........................83(b) <br />3. Placement ................................................................ ...........................83(c) <br />4. Inspections and Certifications ................................. ..........................83(d) <br />5. Impounding Structures ............................................ ...............................84 <br />G. Use of Explosives ............................... ............ ....... (816/817.61-68) <br />1. Blaster Certification ................................................ ...........................61(c) <br />2. Distance Prohibitions .............................................. ...........................61(d) <br />3. Blast Survey/Schedule ............................................. ..........................62-64 <br />4. Warnings & Records .............................................. ........................66 & 68 <br />5. Control of Adverse Effects ..................................... ................................67 <br />H. Subsidence Control Plan .........................................(817.121-122) <br />1. Roads .............................................................. ...(816/817.150-151) <br />1. Road Construction ...........................................................................150(c) <br />2. Certification .....................................................................................151(a) <br />3. Drainage ............................................................ ...... ............. 150(b)-151(d) <br />4. Surfacing and Maintenance ..................................... .............150(e)-151(d) <br />5. Reclamation ............................................................ ..........................150(f) <br />J <br />Signs & Markers .......................................................(816/817.11) <br />1. Signs ................................... ..................................................II(a),(b),&(c) <br />2. Markers ............................... .......................................I I(a),(b),(d),(e),&(f) <br />Distance Prohibitions .......................................................(761.11) <br />Revegetation ................. ....................................(816/817.111-116) <br />1. Vegetative Cover ................ .......................................................11 l &. 116 <br />2. Timing ................................ ..................................................................113 <br />Postmining Land Use ..............................................(816/817.133) <br />D. Backfilling & Grading ..............................(816/817,95-107) K <br />1. Exposed Openings .....................816/817.13, 14, 15, & 823.11 & 21 L <br />2. Contemporaneous Reclamation ..................................................100 <br />3. Approximate Original Contour ..........................................102(a)(1) <br />4..Highwall Elimination .........................................................102(a)(2) <br />5. Steep Slopes (includes downslope) ............................................107 M. <br />6. Handling of Acid & Toxic Materials ......................................102(c) <br />7. Stabilization (rills and gullies) ............... ............95(b) ,. <br />Revised December 4, 1998 Page 2 of -