Laserfiche WebLink
WELL QA/QC FORM <br />Well Designation <br />Date Z-?'- <br />Inspector <br />G <br />Page 5 of <br />c) Length of time cement was allowed to cure after cementation <br />of well casing was complete -f 3 (-, haozs <br />Reason for variation from minimum 6 our curing time <br />_ <br />E. Well development: <br />1) Air surge. <br />a) Was sufficient volume of air available to bring water to <br />surface? Yes No /I/O vf/? <br />1) Depth at which pump was hung <br />Was pump hung within the screened interval? Yes No <br />Reason for not hanging pump within screen intervaT- <br />2) Pump column. <br />a) Size of column <br />b) Material of construction <br /> <br />A-6