Laserfiche WebLink
MONITORING WELL INSTALL&TION SHEET <br />1030 - 001 CLIENT : ;Cotter Corporation <br />MW - 2 <br />:TER NO. P- _.._ <br />DRILLING CONTRACTOR: Custom AW;er Drilling <br />3N: Schwartzwalder Mine <br />F INSTALLATION: 11 - 12 - 81 <br />DE PTH' <br />Open well <br />ETER TYPE: <br />DEPTH (FT.): iu.U, <br />ELEVATION (FT.): <br />10 minutes with clean <br />NG OF THE .HOLE:. <br />water , <br />'TIOK STEEL CASING: <br />0. D. <br />FROM' <br />T0: <br />Vladimir Straskraba <br />FIELD ENGINEER <br />DRILLING SYSTEM:_Auger <br />DRILLING T09LS: Auger - 4" <br />PIPE MATERIAL: PVC 0.D.Sch.40 I.D,2 <br />NON PERFORATED PIPES= FROM: + 3 TO:_154_ <br />PERFORATED PIPES: FROM: $'4 TO: 13'4 <br />GRAVEL PACK: .FROM: 5 TO: 201 <br />TYPE AND DEPTH OF SEALING: <br />2' of Bentanite pellets @ 5' <br />:.,,0 <br />GFO-HYDRO Consulting, Inc: