My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-23_HYDROLOGY - M1977300 (3)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977300
>
2007-11-23_HYDROLOGY - M1977300 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:39 PM
Creation date
11/5/2010 12:02:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
HYDROLOGY
Doc Date
11/23/2007
Doc Name
Hydro Evcal- Vol. II- Ap. B- Packer Test Methods & Results
From
Cotter and Whetstone
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B - Packer Test Methods and Results 4 <br />step, the valve was kept open for 10-30 seconds. The water was captured, and the volume of water <br />bled from the system and the pressure drop were recorded. This was repeated until the pressure in <br />the interval was zero. <br />At any given interval, the entire test could take as little as 45 minutes, except in the very lowest <br />permeability materials, where two hours could be required. <br />• <br />• <br />W * - <br />I f <br />L <br />F` <br /> <br />- V p , ? <br />k 1 <br />4109B.071116 Whetstone Associates <br />Figure 3. Bleed-off Test Conducted in Underground Drill Hole
The URL can be used to link to this page
Your browser does not support the video tag.