My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-23_HYDROLOGY - M1977300 (3)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977300
>
2007-11-23_HYDROLOGY - M1977300 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:39 PM
Creation date
11/5/2010 12:02:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
HYDROLOGY
Doc Date
11/23/2007
Doc Name
Hydro Evcal- Vol. II- Ap. B- Packer Test Methods & Results
From
Cotter and Whetstone
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHWARTZWALDER MINE <br />• <br />• <br />E <br />Packer Test Data Sheet <br />PROJECT: 19C Core Station <br />LOCATION: <br />COORDS: 4475 N 3800 E <br />ROCK TYPE: LSHG <br />START DATE/TIME: 2/23/1999 <br />END DATE/TIME: <br />HYDROGEOLOGIST: P. L. Niesen <br />PACKER PRESSURE: 450 PSI <br />DRILL HOLE NO.: 19C-16 <br />TEST NO.: 8 <br />TEST TYPE: Straddle <br />HOLE DIP & DIRECTION: -6, N59.5W <br />TOTAL DEPTH: 887 ft. <br />HOLE DIAMETER: Bx <br />DEPTH TO TOP PACKER: 143.7 ft. <br />LENGTH OF TEST INTERVAL: 42 ft. <br />TIME ELAPSED <br />TIME <br />VALVE GAUGE FLOW <br />STATUS PRESSURE RATE <br />(open/closed) (PSI) <br />TEST STAGE / COMMENTS <br />10:20:25 0:00:55 CLOSED 360 <br />10:21:30 0:01:05 CLOSED 350 <br />10:22:45 0:01:15 CLOSED 340 <br />10:23:53 0:01:08 CLOSED 330 <br />10:25:07 0:01:14 CLOSED 320 <br />10:26:17 0:01:10 CLOSED 310 <br />10:27:21 0:01:04 CLOSED 300 <br />10:28:54 0:01:33 CLOSED 290 <br />10:30:18 0:01:24 CLOSED 280 <br />10:31:55 0:01:37 CLOSED 270 Packers at 550 PSI. <br />10:33:39 0:01:44 CLOSED 260 <br />10:35:48 0:02:09 CLOSED 250 <br />10:37:55 0:02:07 CLOSED 240 <br />10:40:30 0:02:35 CLOSED 230 <br />10:43:36 0:03:06 CLOSED 220 <br />10:46:06 0:02:30 CLOSED 210 <br />10:49:58 0:03:52 CLOSED 200 <br />10:54:40 0:04:42 CLOSED 190 <br />10:59:59 0:05:19 CLOSED 180 Packers at 525 PSI. <br /> BLEED OFF <br />11:00:30 0:00:31 OPEN 180 Cracked valve. <br />11:00:40 0:00:10 OPEN 140 <br />11:00:43 0:00:03 OPEN 120 <br />11:00:51 0:00:08 OPEN 80 High pressure gauge. <br />11:00:51 0:00:00 OPEN 40 Low pressure gauge. <br />11:02:00 0:01:09 OPEN 30 <br />11:02:24 0:00:24 OPEN 0 Opened valve all the way. <br />11:03:24 0:01:00 OPEN 0 320 ml total flow. 110 ml/min. <br /> Most of flow between 30 and 0 PSI <br /> END OF TEST <br />23 OF 50
The URL can be used to link to this page
Your browser does not support the video tag.