PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />Date : 13-Oct-2010 Permit or job no. C-1982-056 Site: Foidel Creek Mine <br />User : JDM Abbreviation : none State :Colorado <br />Task : 01A Filename : C056-01A County :Routt <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or job action :2010 Midterm Review <br />Task description :Miscellaneous Earthmoving Tasks <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Backfill and regrade, potal/office area dozer 3 517.4 $377,907 <br />002 -Regrade shop/warehouse/parking/stoker areas dozer 1 140.1 $34,117 <br />003 -Regrade and rip waste rock pad and adjacent areas dozer 1 155.91 $41,752 <br />004 -Regrade and rip tipple, stockpile pads and substation areas dozer 1 176.8 $47,360 <br />005 -Remove spoil material from coal handling facility area scraperl 1 44.8 $45,235 <br />007 -Regrade and tip explosives bunker and storage area dozer 1 9.5 $2,556 <br />008 -Regrade and rip rail loop corridor dozer 1 12.0 $3,222 <br />010 -Regrade and rip east mine area disturbance (PM bay, laydown area) dozer 1 40.6 $10,883 <br />011 -Regrade and rip "Brown Palace" office area dozer 1 6.2 $1,679 <br />012 -Regrade and rip training center foundation (above rock dust tanks) dozer 1 4.9 $1,335 <br />013 -Regrade, dispense gravel pad and rip rock dust tank area dozer 1 0.91 $244 <br />014 -Regrade and rip Fish Creek Tipple area dozer 2 54.9 $293,413 <br />015 -Regrade and rip Fish Creek Borehole area incl. treatment ponds dozer 1 44.6 $11,951 <br />016 -Haul remaining ROM stockpile footprint to refuse pile scraperl 2 25.0 $47,470 <br />017 -haul batch weigh stockpile footprint to refuse pile scraperl 2 8.991 $9,274 <br />018 -Push 400,000 CY low quality coal into pit dozer 4 223.31 $217,451 <br />019 -Haul remaining stoker coal pile to refuse pile scraperl 1 14.2 $18,437 <br />020 -Haul BOB coal stockpile footprint to refuse pile scraperl 2 47.9 $90,929 <br />021 -Haul remaining Fish Creek Tipple coal footprint to pit trakload 1 66.9 $73,463 <br />122 -Regrade batch/weigh/loadout system disturbance dozer 1 99.2 $24,171 <br />127 -Haul fill from south of portals to batch weigh area scraperl 1 31.31 $46,275 <br />130 -Regrade EMD dewatering borehole pad (MR228) dozer 1 19.4 $2,517 <br />140 -Regrade EMD vent fan shaft pad dozer 1 90.11 $11,643 <br />175 -Push low quality coal into pit dozer 2 69.31 $36,254 <br />179 -Regrade 6MN pad (Previously TR48 task 806) dozer 1 7.6 $1,981 <br />186 -Spread 80,000CYrefuse material temp storage (previously MR49 901) dozer 2 65.8 $32,071 <br />194 -Regrade 18RT pad area dozer 1 2.6 $539 <br />195 -Backfill reclaim tunnel @ truck loadout (TR53) dozer 1 6.7 $1,741 <br />196 -Regrade truck loadout (TR53) dozer 1 0.9 $116 <br />207 -Regrade .6 acre area associated w/underflow lines grader 1 0.1 $22 <br />209 -Regrade 6MN reservior embankment dozer 2 23.8 $9,168 <br />211 -Regrade pipeline corridor, road corridor, and diversion ditch (TR61) dozer 1 13.2 $2,682 <br />217 -Move 70,000 CY clay back to RDA for cover (MR233) scraperl 2 36.4 $59,318 <br />219 -Regrade stockpile footprint, ditches, and fuel pad scraperl 1 2.31 $268 <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 2,065.1 $1,557,444