Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Task #: 029 State : Colorado Permit/job #: C-80-006 <br />Date : 1110412010 County:Jackson Abbreviation :none <br />User : JHB Site : Man• Mine Filename : 0006-029 <br />Permit or other job action : Rn4 <br />Task description : Mobilize/Demobilize Equipment for Remaining Reclamation <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 907) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $18.82 $20.82 $23.23 <br />Operating cost/hour : $43.13 $45.10 $47.47 <br />Operator cost/hour : $23.90 $23.90 $23.90 <br />Helper cost/hour : $19.49 $19.49 $19.49 <br />Total Unit Cost/hour : $105.34 $109.31 $114.09 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br /> <br /> <br />-Cat D8R Series 11 - 8SU (20 52.55 $46.56 $114.09 1 $160.65 $114.09 $0.00 <br /> <br />-Revegetation equipment 20.00 $66.00 $105.34 1 $171.34 $105.34 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $332.00 $219.44 $0.00 <br />sheet 1 of 2