My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-04_REVISION - C1980006
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980006
>
2010-11-04_REVISION - C1980006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:32 PM
Creation date
11/5/2010 9:44:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
REVISION
Doc Date
11/4/2010
Doc Name
Reclamation Cost Estimate
From
Janet Binns
To
Rob Zuber
Type & Sequence
RN6
Email Name
JHB
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $2.99 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. No. 1 : $2.99 NA NA $0.66 $0.82 $0.83 $0.79 NA NA NA NA <br />-Attachment No. 2 : NA NA NA NA NA NA NA NA NA <br />Annual usage : $3.16 $0.70 $0.59 NA NA NA NA NA NA NA NA <br />Double shifts : $2.37 $0.35 $0.30 NA NA NA NA NA NA NA NA <br />Triple shifts : $2.11 $0.23 $0.20 NA NA NA NA NA NA NA NA <br />Mech. Ibr.-Machine and Attach. No. 1: NA NA NA $0.40 NA $0.50 NA NA NA NA NA <br />-Attachment No. 2 : NA NA NA NA NA NA NA NA NA NA NA <br />Fuel/tube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $8.58 $1.09 $0.60 $0.00 <br />Attachment No. 2 : NA NA NA NA NA NA NA NA NA NA NA <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Basic Machine and Attachments No. 1 and No. 2 : Basic Machine and Attachment No. 1 <br />Single shifts : $3.16 $0.70 $0.59 $0.40 $0.82 $0.50 $0.79 $8.58 $1.09 $0.60 $0.00 <br />Double shifts : $2.37 $0.35 $0.30 ttachment: <br />Triple shifts : $2.11 $0.23 $0.20 NA NA NA NA NA NA NA NA <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20'1o 14.48% ($/hr) Shift Differential Colorado labor zone : 2 <br />General Labore $12.44 $3.53 $0.95 $0.77 $1.80 $19.49 Day : $0.00 Two shift per day average : $0.15 <br />N $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Swing : $0.30 Three shift per day average : $0.25 <br />Truck Mechanic $16.74 $4.20 $1.28 $1.04 $2.42 $25.68 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $4.45 $12.78 NA $19.49 $36.72 <br />Double shifts : $3.02 $12.78 NA $19.64 $35.44 <br />Triple shifts: $2.54 $12.78 NA $19.74 $35.06 <br />EQUIPMENT PERFORMANCE DATA <br />Description Type Struck <br />Capacity (cy) Heaped <br />Capacity (cy) Weight <br />(UST) Weight <br />(MT) Length <br />(ft) Width <br />(ft) Height <br />(ft) Min. turning <br />circle (ft) Horsepower <br />(fhp) Fuel <br />type <br />Light Duty Pickup, 44, 1 T. Crew NA NA NA 2.45 2.22 16.00 6.00 7.00 NA 325.00 Diesel <br />NA NA NA NA NA NA NA NA NA NA NA NA <br />NA NA NA NA NA NA NA NA NA NA NA NA <br />Travel speeds (mph): 1 st (or max. 2nd 3rd 4th 5th 6th 7th 8th Minimum dump Max. dump <br />Forward : NA NA NA NA NA NA NA NA clearance (ft.) height (ft.) <br />Reverse: NA NA NA NA NA NA NA NA NA NA <br />Loader bucket type or Compaction Maximum vertical Max. horiz. Excavator bucket capacity (cy) Lift capacity (lbs) Max.dig/rip Shank No. <br />Compactor drum type width/pass (ft.) reach height (ft.) reach (ft) small medium large optimal max. reach depth (ft.) spacing shanks <br />NA NA NA NA NA NA NA NA NA NA NA NA
The URL can be used to link to this page
Your browser does not support the video tag.