My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-04_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-11-04_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:26 PM
Creation date
11/5/2010 7:56:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/4/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: 10/17/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />ame& <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: October 23, 2010 <br />Reporting Period: 10/17/10 through 10/23/10 <br />Days S M T W T F S <br />Work Shifts D D D D D D D <br /> - - N N N N N <br />D = Day Shift N = Night Shift <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Ambient Temperature Range (F): Low: 47°F to 64°F (+/-) High: 34°F to 37°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Night shift began for ore placement within the Phase 5 PSSA on 10/19/2010. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />Subgrade was inspected and approved for soil liner fill placement by an AMEC field <br />representative in the area shown on Figure 1. <br />B) Slope Contouring <br />1) VLF <br />Slope contouring was performed between stations A54+00 (+/-) and 60+00 (+/-), <br />approximately 0 to 100 feet left of centerline using various CAT dozers. <br />C) Cut to Fill <br />1) VLF <br />Fill material was placed between stations C5+00 (+/-) and C5+25 (+/-), approximately 0 to 20 <br />feet right of centerline using a CAT D8 dozer and a 10-ton vibratory smooth drum compactor. <br />This was performed to allow for access around the low volume solution collections riser pump <br />house. <br />VLF Weekly Report WE 10.23.10.13
The URL can be used to link to this page
Your browser does not support the video tag.