Laserfiche WebLink
Seneca Il-W - Phase I Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982-057 Christy Hulsman <br />2 <br />_AL <br />Frc. cP - Haul Read "l and corridor. <br />area is, regraded and stabie. <br />Abundant thistle Will need to <br />addressed before phase 2 Bond <br />release eligibility <br />Page 9 of 14 <br />Seneca 11-W- Phase I Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982-057 Christy Hulsman <br />i'7? ?•: a?, { ink ..... ?, <br />Fig. 11 - Repaired channel below <br />outlet of stock pond T-25, TRM was <br />placed like shingles (overlapping <br />horizontal sections). <br />Seneca 11-W - Phase I Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982-057 Christy Hulsman <br />?t a <br />wig <br />_c+ . z <br />r=ig. 10 - C hannei below outlet of <br />suck Pond T-25 Was heavily] eroded <br />in the upper section. Section was <br />repaired by the end o the <br />inspection. <br />Page 10 of 14 <br />Seneca 11-W - Phase I Bond Release (SL-3) 912112010 <br />Peabody Coal Co. to 912312010 <br />Permit Number: C-1982-057 Christy Hulsman <br /> 7. <br /> <br />II <br />? ? <br />of <br /> <br /> V I?T <br />G• t <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Fig. 12 - Haul road "1" 9, corridor <br />Page 11 of 14 Page 12 of 14