Laserfiche WebLink
6.4.1 Exhibit A - Legal Description <br />No comment. <br />6.4.2 Exhibit B - Index Map <br />No comment. <br />6.4.3 Exhibit C - Pre-mining and Mining Plan Map(s) of Affected Lands <br />The Applicant has indicated there are power lines and buried communication lines on the <br />west side of Weld County Road 81. As required by Rule 6.4.3(b), please revise the Pre- <br />mining and Mining Plan Maps to show the location of the power and communication lines <br />that are within 200 feet of the boundary of the affected land. In addition, show the owner's <br />name of these structures as required by Rule 6.43(8). <br />4. The Applicant has stated the power and communication lines on the west side of Weld <br />County Road 81 are within the prescribed right-of-way for the road. The Division requests <br />the Applicant depict the prescribed right-of-way on the Pre-mining and Mining Plan Maps. <br />6.4.4 Exhibit D - Mining Plan <br />5. The Applicant has stated the site will be mined in 2 separate phases. Please commit to <br />delineating the active phase with monuments or other markers. <br />6. The Applicant has stated the access road will be 24 feet wide. Please indicate if the access <br />road will be paved or if water conveyance structures will be installed. The Division requests <br />this information in order to calculate the financial warranty estimate. <br />7. According to Exhibit D, the topsoil stockpiles will be vegetated if they are left in place for <br />more than 180 days. Please specify the seed mix to be used to stabilize the topsoil stockpiles. <br />Seed quantities shall be specified as pounds of pure live seed per acre. <br />The Applicant has stated stormwater diversion ditches may be either a cut ditch or a berm. <br />Please specify which method will be used and provide the Division with a typical cross <br />section of the structures. This information is required in order to calculate the financial <br />warranty estimate. <br />9. According to Exhibit D, stormwater will be routed into sediment ponds. Please provide the <br />Division with a typical cross section and design specifications of the sediment ponds. In <br />addition, please indicate the point in the mining process the sediment ponds will be <br />constructed.