Laserfiche WebLink
Item #3 -- Bond Estimate: <br />3.) Based on your response to the items above, the Division will conduct a financial warranty estimate for the <br />current level of disturbance and adjust the required financial warranty accordingly. <br />Item #4 -- Hydrologic Balance: <br />4.) The Division approves the locations of the proposed piezometers. Please specifically state that groundwater <br />elevations will be monitored on a quarterly basis until the permit has been released by the Division and commit to <br />supplying the Division with the results of the measurements in the annual reclamation report. Please indicate <br />when monitoring will begin. <br />If you have any questions please feel free to contact me at (303) 866-3567 ext. 8120. <br />Sincerely, / <br />Jared Ebert <br />Environmental Protection Specialist - DRMS <br />Cc: Tony Waldron, DRMS