My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-31_REPORT - M2002004
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2002004
>
2001-12-31_REPORT - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 2:18:34 PM
Creation date
11/3/2010 9:58:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
REPORT
Doc Date
12/31/2001
Doc Name
2001 Annual Report
From
GCC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The estimated market value of the derivatives covering the exchange of interest rates and/or currencies will fluctuate in time <br />and is determined by futures market price quotations for interest Yates and currencies. These values must be analyzed from the <br />standpoint of the market value of the underlying instruments, and as part of the Company's total exposure with respect to <br />fluctuations in interest rates and exchange rates. Nominal amounts of derivatives do not necessarily represent cash amounts <br />exchanged by the parties and, consequently, there is no direct measurement of the Company's exposure derived from the use <br />of these derivatives. The cash amounts exchanged are determined based on the nominal amounts and other terms specified in <br />........................... <br />the derivatives. <br />Protection against increases in the price of natural gas <br />The Company periodically uses derivatives whose underlying asset is the price of natural gas to limit costs associated with the <br />use of natural gas. At December 31, 2001, the Company has entered into the following transactions covering natural gas, <br />contracted in U.S. dollar. <br />Hedges contracted to date (Fixed price) <br />Volume Contracted Fair <br />Date Mmbtu price value Amount Variances <br />January 2002 54,000 3.502 2.555 137,970 $ (51,138) <br />January 2002 26,ooo 3.615 2.555 66,300 (27,56o) <br />February 2002 81,000 3.470 2.570 208,170 (72,900) <br />Total 16i,ooo _ S (151,598) <br />Hedges contracted to date (Tunnel price) <br />Volume Contracted price Initial Fair <br />Date Mmbtu ceiling now premium value Amount Variances <br />January 2002 62,000 4.00 3.55 0.10 -0.995 (61,69o) i (67,890) <br />January 2002 54,000 3.00 2.15 0.10 -0.100 (5,400) (10,800) <br />February 2002 49,000 3.00 2.15 0.10 -o.o69 (3,381) (8,281) <br />Total 178,000 (70,741) S (87,971) <br />(Thousands of Mexican pesos with purchasing power at December 32, 2002 and thousands of <br />D.S. dollars. except for per share values and exchange rates)
The URL can be used to link to this page
Your browser does not support the video tag.