My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-03_PERMIT FILE - M2002004
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2002004
>
2002-07-03_PERMIT FILE - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 2:18:41 PM
Creation date
11/3/2010 9:46:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
PERMIT FILE
Doc Date
7/3/2002
Doc Name
Responses to Adequacy Issues (1 of 2)
From
Rio Grande Portland Cement
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D <br />soil/subsoil. This material will subsequently be utilized to reclaim the open areas of the Year-1 block at <br />• the completion of mining, and for regrading and reclaiming the central conveyor slot at the completion of <br />mining each panel. Alternatively, material for reclamation of the Year 1 block may come from the <br />stockpile located up gradient of year 5. Refer to the generalized cross-sections A-A' through C-C' on <br />Exhibit D-1, which illustrate the position of in-pit reclamation backfill and the conveyor corridor slot <br />during active mining. <br />An average of approximately 18,000 tons per year of Codell Sandstone that lies directly below the <br />limestone will be removed. The sandstone will be moved to the plant via the same route as the limestone: <br />from the crusher and enclosed conveyor belt to plant. The actual thickness of the material to be removed <br />will vary between 2 and 6 feet depending upon quality of this unit. <br />TOPSOIL & SUBSOIL SALVAGE <br />As discussed in more detail in Exhibit I - Soils Information, A and E-horizon topsoil materials will be <br />salvaged separately from AC or B-horizon subsoil materials. Topsoil and subsoil removal and <br />replacement operations may be conducted with any of several combinations of equipment including a <br />scraper, truck/shovel, truck/loader, backhoe, dozer, etc. Mobile equipment will be used to remove topsoil <br />and subsoil materials that will be either directly hauled from the pit in advance of reclamation or placed in <br />stockpile storage area shown on the mine plan, adjacent to each production panel for easy re-application <br />to the mined area. It is proposed that each production block will be fully reclaimed by placing the <br />overburden material from the adjacent panel on the floor of the pit and then reapplying the subsoil and <br />topsoil. Reclamation of active roadways along which conveyor belts are located, will be performed when <br />the conveyors and roadways are no longer required for mining activities and either relocated or <br />permanently removed. <br />• Rio Grande is proposing two topsoil/subsoil removal options. The first option is utilized when topsoil and <br />subsoil materials are being directly hauled from the pit in advance of reclamation. The second option is <br />utilized when topsoil and subsoil materials are being stockpiled for later redistribution. The baseline Soil <br />Volume Summary contained in Exhibit I - Soils Information, contains a listing of soil types and <br />recommended salvage depths. The salvage depths are based on critical review of the Rio Grande soil <br />laboratory analyses contained in Appendix B - SOILS DOCUMENTATION, the baseline soil surveys <br />and the NRCS Soil Survey for Pueblo County (SCS, 1979). While these topsoil and subsoil salvage <br />depths average 6 and 12-inches respectively, soil salvage depths will be determined by actual soil depths <br />that are determined generally by topographic position. Deep topsoil is usually located in draws and valley <br />floors while ridge tops have generally very shallow topsoil. Shallow ridge topsoil usually covers <br />unweathered overburden that may not be favorable for final reclamation. <br />The suitability of the native topsoil and subsoil materials to sustain several native plant communities will <br />be determined by using WDEQ/LQD Table I-4: Criteria to Establish Overburden Suitability (Wyoming <br />DEQ, 1994) as described in Exhibit I - Soils Information. Suitability criteria will be met for pH, electrical <br />conductivity, saturation percentage, texture, sodium adsorption ratio, selenium, boron and percent by <br />volume of coarse fragments. If the topsoil and subsoil materials comply with WDEQ/LQD's criteria as <br />"suitable" or "marginal" these materials will be acceptable for use as a plant growth substrate over the <br />final graded backfill material. <br />Direct Haul Topsoil/Subsoil Salvage Option. Salvaged topsoil and subsoil materials will be directly <br />hauled and placed on final graded backfill whenever possible. The advantages of direct-haul topsoil are <br />discussed further in Appendix G - RECLAMATION PLAN SUPPORT DOCUMENTATION. The <br />• following topsoil/subsoil removal option will be utilized when the salvaged soil is being directly hauled <br />1180-Mine Permit Exhibits (Jul.05.02)FINAL.doe D-5 <br />July 8, 2002
The URL can be used to link to this page
Your browser does not support the video tag.