Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />:::::::................................................................................................................................................................................ <br />PROJECT ............................................... <br />IDENTIFICATION <br />Task # : 003 State : Colorado Permit/job# : M2010054 <br />Date <br />User <br />10/28/2010 <br />PSH <br />County :Huerfano <br />Site : Williams No. 1 Pit <br />Abbreviation :none <br />Filename :M054-003 <br />Agency or organization name : Colorado Department Of Reclamation, Mining And Safety <br />Permit or other job action : Williams Pit No. 1 Bond Estimate <br />Task description : Topsoiling (7" /Avg) - 9.85 Acres <br />:::::% <br />HOURLY ................................................... <br />EQUIPMENT C <br />OST <br />Basic machine : Cat D8R Series 11- 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $162.90 Total fleet cost/hour : $162.90 <br />:::.::........................................ <br />MATERIAL <br />QUANTITIES ................................................... ........................................................................ ............................... ......... <br />................... <br />Initial Swell Loose <br />volume: 9,263 L CY factor : NA volume : 9,263 LCY <br /> <br />Source of estimated volume: Permit Application <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION ON <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 377.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,100 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.72 <br />Weight description <br />Top Soil Adjusted unit production : 270.36 LCY/hr <br /> Adjusted fleet production : 270.36 LCY/hr <br /> <br />JOB TIME AND :::::................................ <br />COST ................................................... ....................................................................... ............................... ........................... <br />Fleet size : 1 Dozer(s) Total job time : 34.26 Hours <br />Unit cost : $0.603 /LCY Total job cost : $5,581 <br />