My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-02_PERMIT FILE - M2010054 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010054
>
2010-11-02_PERMIT FILE - M2010054 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:27 PM
Creation date
11/2/2010 2:55:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010054
IBM Index Class Name
PERMIT FILE
Doc Date
11/2/2010
Doc Name
Adequacy Review
From
DRMS
To
LJ Development, Inc.
Email Name
PSH
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />- - ...................................... <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION ..... .......:::::: <br />FORM <br />USED .:::::::::.::::: <br />FLEET <br />SIZE .:::::::::::::::::: », <br />TASK <br />HOURS .»»» .»,.;;;;;:.:;< <br />DIRECT <br />COST <br />001 -Backsloping dozer 1 2.9 $481 <br />002 -Replacing Overburden (4"/Avg) - 9.85 Acres dozer 1 31.0 $5,062 <br />003 -Topsoiling (T'/Avg) - 9.85 Acres dozer 1 34.2 $5,581 <br />004 -Revegetation - 9.85 Acres revege 1 40.0 $9,708 <br />005 -Mob/Demob mobilize 1 3.71 $1,599 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 111.9 $22,431 <br />- incwaes innation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />NA % <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />not required (or eqp. operator serves as super.) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />TOTAL DIRECT COST `=I $22,431 <br />2.02 % of direct total = $453 <br />1.05 % of direct total = $236 <br />NA" NA NA total = NA <br />10.00 % of direct total = $2, 243 <br /> TOTAL 0 & P = $2,932 <br /> CONTRACT AMO UNT (direct + O & P) = $25,363 <br />0.00 total $ NA total = $0 <br />NA NA NA total = NA <br />5.00 % of cntr. NA total = $1,268 <br />NA* NA total = NA <br />contingencies accounted for at task level <br />TOTAL INDIRECT COST = $4,200 <br />TOTAL BOND AMOUNT (direct + indirect) _ $Z"-3r
The URL can be used to link to this page
Your browser does not support the video tag.