Laserfiche WebLink
Permit or other job action : Williams Pit No. 1 Bond Estimate <br />Task description : Mob/Demob <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> Operating cost/hour : $44.38 $46.13 $50.07 <br /> Operator cost/hour : $27.66 $27.66 $27.66 <br /> Helper cost/hour : $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine Weight/unit Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT permit <br />Description (Tons) Cost/hr/unit Cost/hr/unit (No. units) Cost/hr/fleet Cost/hr/fleet Cost/fleet <br />-Cat D8R Series 11 - 8SU (20 52.55 $46.56 $125.45 1 $172.01 $125.45 $500.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $172.01 $125.45 $500.00 <br />