My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-01_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-11-01_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:26 PM
Creation date
11/2/2010 1:41:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
11/1/2010
Doc Name
Amendment to the Application for Phase III Bond Release
From
Colowyo Coal Company
To
DRMS
Type & Sequence
SL5
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jennifer Sekulski-Barton <br />Colowyo Coal Company <br />O 5731 State Highway 13 <br />Meeker, CO 81641 <br />T: 970-824-1529 <br />1?• <br />r? Mr. James R. Stark <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />October 27, 2010 <br />RE: Amendment to the Application for <br />E® <br />NQV p ? ?41Q <br />p1Vwing and saw] <br />1999 Reclaimed Areas. Colowvo Coal Comoanv L.P. Permit No. C- <br />1981-019 <br />Dear Mr. Stark, <br />The purpose of this letter is to amend the Phase III bond release application, SL-05, <br />submitted by Colowyo on June 25 2010 to the Colorado Division of Reclamation, <br />Mining and Safety (Division), to include materials requested by the Division as a <br />result of the onsite bond release inspection report, dated August 24, 2010. This <br />amendment specifically addresses the 138 kV transmission line that runs through <br />the requested Phase III bond release area. <br />In order to provide the Division with as much information as needed to assess this <br />power line issue, Colowyo has included copies of the State and Bureau of Land <br />Management (BLM) Right of Way documents for this transmission line, letters from <br />both Tri-State Generation and Transmission, Inc. and the landowner stating their <br />respective positions regarding the transmission line and a revised SL-05 map <br />detailing the right of way corridor. <br />Once this information is assessed for the purpose of the SL-05 bond release <br />application, Colowyo will provide the Division with the requested minor revision to <br />the permit detailing this right of way. <br />Please contact me if you have any questions concerning this amendment to the <br />application for bond release. Colowyo looks forward to working to working with the <br />Division on this bond release application. <br />Sincerely, <br />4 OA" <br />Je fifer S kuls kaon <br />Environmental Engineer <br />Encl. 1 copy of ROW enclosures <br />Cc: CF 24.1
The URL can be used to link to this page
Your browser does not support the video tag.