My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-02_REPORT - M1978039HR
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1978039
>
2010-11-02_REPORT - M1978039HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:29:28 AM
Creation date
11/2/2010 11:53:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978039HR
IBM Index Class Name
REPORT
Doc Date
11/2/2010
Doc Name
Annual Fee/Report/Map
From
Denison Mines (USA) Corp.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ATTACHMENT TO ANNUAL REPORT <br />ST JUDE MINE <br />PERMIT NO. M-1978-039HR <br />November 1, 2010 <br />In July 2007, the mine site was occupied, and site maintenance and clean-up were performed. <br />Preliminary mine preparation work was completed to re-establish utilities to the mine site and to <br />reopen the portal. As of the date of this report, no ore were produced from the St. Jude Mine in <br />2010. While the mine is presently in Temporary Cessation status, a small amount of ore <br />production is possible in the upcoming year from the Sunday Mine Complex; however it is <br />unlikely. <br />In March of 2008, the Division provided notification to Denison Mines that the St Jude Mine is a <br />Designated Mining Operation. In July of 2009, Denison submitted an Environmental Protection <br />Plan (EPP) for the St Jude Mine as part of the Sunday Mine Complex. In September of 2009, <br />Denison received comments on the EPP from the Division, and Denison addressed these <br />comments and resubmitted the EPP in December of 2009. Additional minor comments were <br />received in February of 2010 and addressed by Denison in March of 2010. Conditional <br />acceptance of the EPP was received from the Division in June of 2010 and a response was <br />submitted accepting the conditions with one minor change requested in August of 2010. <br />Denison is waiting on a response from the Division to finalize this DMO/EPP Process. <br />Noxious weed control was completed using a pesticide pre-emergence for halogeten and <br />knapweed. This was observed to have mixed results and we will continue in the spring of 2011 <br />using the original method of spraying after weeds are visible. Treatments were made along the <br />roads and at the mine sites. <br />All work at the St. Jude Mine has been completed in conformance with approved Division Mine <br />Permits. <br />No changes occurred in the Permit M-1978-039HR area during the past year. Routine <br />maintenance of berms and temporary sediment basins was completed in September of this year
The URL can be used to link to this page
Your browser does not support the video tag.