My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-10-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:26 PM
Creation date
11/1/2010 9:39:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/27/2010
Doc Name
CQA Rpts: 2010: 9/19, 9/26, 10/3 and 10/10.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amecIO <br />anchor trench backfill. The trench was found to be backfilled in accordance with design <br />drawings and project specifications. <br />C) Geomembrane Acceptance <br />1) VLF <br />Primary 100mil geomembrane (P-317 thru P-335 and P-342 thru P-355) shown on Figure 4 <br />was inspected by AMEC and Lonestar representatives, found to be installed within project <br />specifications and acceptable for continued construction activities. <br />D) Geomembrane Delivery <br />1) VLF <br />Four loads (44 rolls of 80mil and 4 rolls of 40mi1) of LLDPE geomembrane rolls were <br />delivered to site during the shift. The loads were delivered on flat bed trucks in good condition. <br />The rolls were unloaded using a CAT 950 front-end loader with forks attached. The <br />geomembrane was placed on three pieces of HDPE pipe, stacked two rolls high. An AMEC <br />field representative inventoried the geomembrane and was present at all times during <br />unloading of the geomembrane. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed structural fill placement within the Phase 5 VLF fill area. <br />AMEC inspected and approved subgrade prior to geomembrane deployment. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed and inspected anchor trench backfill. <br />AMEC observed the installation of the low volume solution collection system. <br />AMEC constantly monitored the LVSCF placement. Samples were also obtained of placed LVSCF. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC continuously monitored the DCF placement. <br />AMEC observed the installation of the high volume solution collection system. <br />AMEC observed the placement of the high volume solution collection riser bases. <br />VLF Weekly Report WE 09.25.10.13
The URL can be used to link to this page
Your browser does not support the video tag.