Laserfiche WebLink
e <br />O <br />CN 11 <br />hqO 86k?0 ?x0 \ \\\ <br />` LEGEND: <br />/ EXISTING GROUND SURFACE CONTOUR AND EL. FEET <br />PROPOSED GROUND SURFACE CONTOUR EL. FEET <br />- EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />?- ----1 PREVIOUSLY DEPLOYED LINER <br />DEPLOYED LINER <br />O? C <br />X <br />X <br />c? <br />00 <br />0 <br />DO+o0 <br />N <br />O\\ <br />O <br />O <br />O <br />o° <br />00 <br />NOTES: <br />APPROXIMATELY 138,988 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 3,379,234 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />I <br />Z <br />c" CRIPPLE CREEK & VICTOR <br />C0 GOLD MINING COMPANY <br />ti MxcT <br />PHASE 5 VLF <br />i Tr>? <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />o PSSA PRIMARY 100 MIL <br />_N DESIGNED By CUT CHECKED BY JDN DATE <br />DRAWN By CMT APPROVED By JON 10/09/ <br />EARTH AND ENVIRONMENTAL CAM FI D "t T G WV <br />CIO J <br />- 3b 0