My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-27_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-10-27_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:26 PM
Creation date
11/1/2010 9:39:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/27/2010
Doc Name
CQA Rpts: 2010: 9/19, 9/26, 10/3 and 10/10.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND: <br /> EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br /> O <br />O <br />PROPOSED GROUND SURFACE CONTOUR EL FEET <br /> <br /> O <br />O tp <br />4U <br />- __ _ - EXISTING UNIMPROVED ROAD/TRAILS <br /> + <br /> O EXISTING IMPROVED ROADWAYS <br />- <br /> O h EXISTING DRAINAGES <br /> O Y .i-----?- PREVIOUSLY DEPLOYED LINER <br /> O <br /> XO 00 DEPLOYED LINER <br /> ^(b <br /> C 0 <br /> p N NOTES; <br /> O O = APPROXIMATELY 237,782 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br /> O O DURING WEEK <br /> Ox <t/ O APPROXIMATELY 2,965,430 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br /> X <br />OO <br /> 00 `Z <br /> ev <br />^ <br /> N ? O <br /> ? <br /> O <br />O <br /> <br />O <br />O <br />41 <br />+ <br />v- co <br /> <br />? <br />O p <br />O O <br /> + <br /> <br />O <br />0 <br />c0 <br />Lit <br /> <br />0 <br />O N <br />7 <br />-1' <br />LO <br />N ? <br />2 <br />O <br /> O <br /> O <br />+ <br />X? <br />0 00 ? <br />Q <br />+ w <br />00 <br />N + <br />N <br />= <br />f9 <br />O r <br />X <br /> 0 O CUM CRIPPLE CREEK & VICTOR <br /> <br /> <br />XO <br />G32+00 <br />h GOLD MINING COMPANY <br />O w tkx ? ? PHASE 5 VLF <br /> P <br /> Tm <br /> PHASE 5 GEOMEMBRANE INSTALLATION <br /> oo PSSA PRIMARY 100 MIL <br /> r <br /> X <br />f ??f DESIGNED BY CMT CHECKED BY JON DATE <br />.. <br /> <br />1 <br />ane& <br />DRAWN BY <br />CUT APPROVED BY <br />JON <br />09/25/10 <br /> <br />D4+ 7 <br />? EARTH AND ENVIRONMENTAL _ CAW FLDIAYE FKAIRE Na REY <br />+00 - 3 0
The URL can be used to link to this page
Your browser does not support the video tag.