My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-25_REVISION - X201023200 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
X201023200
>
2010-10-25_REVISION - X201023200 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:11 PM
Creation date
10/27/2010 1:16:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X201023200
IBM Index Class Name
REVISION
Doc Date
10/25/2010
Doc Name
Amendment Request
From
New Elk Coal Company LLC
To
DRMS
Type & Sequence
AM1
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4. Estimated Cost Bonding Requirements. <br />Drill Hole <br />Name <br />Mud Pits Regrade <br />Pads Reseed <br />Pads Regrade <br />New <br />Roads Reseed <br />New <br />Road Seal and <br />Plug <br />Holes Move <br />Site to <br />Site Estimated <br />Total <br />Costs <br />NE-01-10 $200 $288 $22 $2,618 $500 $3,975 <br />NE-02-10 $200 $288 $22 $3,023 $500 $4,033 <br />NE-03-10 $200 $288 $22 $2,151 $500 $3,485 <br />NE-04-10 $200 $288 $22 $2,958 $500 $3,968 <br />NE-05-10 $200 $288 $22 $1,999 $500 $3,009 <br />NE-06-10 $200 $288 $22 $2,748 $500 $3,758 <br />NE-07-10 $200 $288 $22 $5,054 $500 $6,064 <br />NE-08-10 $200 $288 $22 $4,913 $500 $5,923 <br />NE-09-10 $200 $288 $22 $4,482 $500 $5,492 <br />NE-10-10 $200 $288 $22 $4,747 $500 $5,757 <br />NE-11-10 $200 $288 $22 $5,214 $500 $6,224 <br />NE-12-10 $200 $288 $22 $1,459 $500 $2,469 <br />NE-13-10* <br />NE-14-10 $200 $288 $22 $1,991 $500 $3,001 <br />NE-15-10 $200 $288 $22 $1,991 $500 $3,001 <br />NE-16-10 $200 $288 $22 $543 $500 $1,553 <br />NE-17-10 $200 $288 $22 $543 $500 $1,553 <br />TOTALS $2,400 $3,456 $264 $46,434 $8,000 $63265 <br />*NE-13-10 lies within the disturbed area of the permit, no additional bonding required <br />Mobilization and demobilization drill rig - $1,600*16 =$25,600 <br />Mobilization and demobilization dozer - $800*16 = $12,800 <br />Supervision (17 hours at $52.10/hr) _ $886 <br />Total direct cost bond estimate: $102,551 <br />Profit, Insurance, Bond (13.07%) = $13,403 <br />Engineering (4.25% of contract) = $4,358 <br />Reclamation Management (5% of contract) = $5,127 <br />TOTAL <br />=$125,440 <br />NECC NOI Attachment REVISED 10_21_10 6
The URL can be used to link to this page
Your browser does not support the video tag.