Laserfiche WebLink
New Horizon Mine - TopsoilSampling Results <br />Reference: Table 2.05.4(2((d( -I <br />CV- 2010 -003 Abatement Item No. 1 <br />Required 6y current permit and Provided with 2009 ARR, but not Provided w/ August 2010 NOV No longer required In future per PR -06 for Zone 7 Mixed Topsoil criteria <br />provided with 2009 AR rently required abatement package Zone 7 Mixed Topsoil following approval of PR -06 <br />� <br />• <br />� <br />®m�m����m® <br />®moo <br />©oo <br />. • <br />� <br />„• <br />® <br />®mom <br />®����m <br />®m�0000 <br />• <br />��m <br />® <br />® <br />®�� <br />®® <br />®mom <br />©o® <br />� <br />• <br />®gym <br />®m <br />®���� <br />®�� <br />®oo® <br />Required 6y current permit and Provided with 2009 ARR, but not Provided w/ August 2010 NOV No longer required In future per PR -06 for Zone 7 Mixed Topsoil criteria <br />provided with 2009 AR rently required abatement package Zone 7 Mixed Topsoil following approval of PR -06 <br />