Laserfiche WebLink
CTLITHOMPSON <br />MODIFIED PACKER FIELD TEST FOR PERMEABILITY <br />0 <br />?Hp <br />Project No.: FC04797-145 <br />Project Name: Goose Haven <br />Test Location: TH-45 <br />Test Section: 2.0 <br />Date: 10/13/2009 <br />Casing Radius (R) = 0.23 ft <br />Length of Test Section (L) = 10 ft <br />Average Gravity Head (Hg) = 26 ft <br />Conductivity: <br />Q In L <br />k 2)cL(Hg + H p) R <br />Note: only where L > 1Or <br />*There was no flow when test was ran at 10 psi <br />(NTS) <br /> <br />TIME INTERVAL <br />PERIOD <br /> <br />sec WATER <br />PRESSURE <br />APPLIED <br />(psi) PRESSURE <br />HEAD <br />Hp <br />ft FLOW <br />GAUGE <br />cumulative <br />al WATER <br />SUPPLY <br />cumulative <br />al FLOW <br />RATE <br />Q <br />cfs INTERVAL <br />PERMEABILITY <br />k <br />ft/s INTERVAL <br />PERMEABILITY <br />k <br />fU r <br />11:15:00 0.0 765 0.0 <br />19 <br />11:16:00 60 15.0 34.7 765.27 0.3 6.0E-04 6.0E-07 <br />11:17:00 60 15.0 34.7 765.48 0.5 4.7E-04 4.7E-07 15 <br />18:00 <br />11 60 15.0 34.7 765.72 0.7 5.4E-04 5.3E-07 17 <br />: 04 <br />8E <br />5 8E-07 <br />5 18 <br />11:19:00 60 15.0 34.7 765.98 1.0 - <br />. . <br />11:20:00 60 15.0 34.7 766.27 1.3 6.5E-04 6.4E-07 20 <br />11:21:00 60 15.0 34.7 766.55 1.5 6.3E-04 6.2E-07 20 <br />11:22:00 60 15.0 34.7 766.83 1.8 6.3E-04 6.2E-07 20 <br />11:23:00 60 15.0 34.7 767.1 2.1 6.0E-04 6.0E-07 19 <br />11:24:00 60 15.0 34.7 767.4 2.4 6.7E-04 6.7E-07 21 <br />11:25:00 60 15.0 34.7 767.68 2.7 6.3E-04 6.2E 07 20 <br />Answer <br />Average Permeability (k) = 19 ft/yr <br />Average Permeability (k) = 0.051 ft3/day/ft2 <br />Average Permeability (k) = 1.8E-05 cm/s <br /> <br />McLAUGHLIN WATER ENGINEERS, LTD <br />• GOOSE HAVEN RESERVOIR COMPLEX EXPANSION FIGURE D-4 <br />CTLIT PROJECT NO. FC04797-145 <br />--w I ?Db