My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-22_PERMIT FILE - M2010071 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010071
>
2010-10-22_PERMIT FILE - M2010071 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:07 PM
Creation date
10/25/2010 3:24:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010071
IBM Index Class Name
PERMIT FILE
Doc Date
10/22/2010
Doc Name
New Appl- Ground Water Response Study
From
The City of Lafayette
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• TABLE OF CONTENTS <br />INTRODUCTION 1 <br />RESERVOIR EFFECT ON GROUND WATER 1 <br />SITE DESCRIPTION 2 <br />PROPOSED RESERVOIR NO.2 2 <br />OUTLINE OF GROUND WATER RESPONSE METHODOLOGY 3 <br />GEOLOGY 4 <br />SURFACE WATER FEATURES 4 <br />PREVIOUS INVESTIGATIONS 5 <br />AREA GEOMORPHOLOGY 5 <br />GROUNDWATER MODEL 7 <br />_ MODEL VERIFICATION 11 <br />VISUAL MODFLOW BEFORE CONSTRUCTION OF RESERVOIR NO.2 11 <br />VISUAL MODFLOW AFTER RESERVOIR NO.2 CONSTRUCTION 11 <br />• PRESENTATION OF EFFECT OF RESERVOIR NO.2 ON GROUNDWATER 12 <br />RECOMMENDATIONS 12 <br />LIMITATIONS 13 <br />FIGURE 1 - SITE LOCATION MAP <br />FIGURE 2 - ESTIMATED GROUNDWATER ELEVATION CONTOURS FROM FIELD <br />MEASUREMENTS FOR THIS REPORT <br />FIGURE 3 - ESTIMATED GROUNDWATER ELEVATION CONTOURS BEFORE <br />RESERVOIR CONSTRUCTION FROM RESPONSE MODEL <br />FIGURE 4 - ESTIMATED GROUNDWATER ELEVATION CONTOURS AFTER <br />RESERVOIR CONSTRUCTION FROM RESPONSE MODEL <br />FIGURE 5 - ESTIMATED CHANGE IN GROUNDWATER ELEVATION AFTER <br />RESERVOIR CONSTRUCTION <br />FIGURE 6 - ESTIMATED CHANGE IN GROUNDWATER ELEVATION AFTER DRAIN AND <br />RESERVOIR CONSTRUCTION <br />FIGURE 7 - ESTIMATED GROUNDWATER DEPTH CONTOURS FROM FIELD <br />MEASUREMENTS FOR THIS REPORT <br />APPENDIX A - DRAIN <br />APPENDIX B - GEOTECHNICAL INVESTIGATION <br />GOOSE HAVEN RESERVOIR COMPLEX EXPANSION <br />• GOOSE HAVEN RESERVOIR NO.2 <br />LAFAYETTE, COLORADO <br />PREPARED FOR McLAUGHLIN WATER ENGINEERS, LTD <br />(PROJECT NO. FC04797-145; DATED MARCH 10, 2010)
The URL can be used to link to this page
Your browser does not support the video tag.