Laserfiche WebLink
-4- <br />12. Prima future (Post-mining)land use check one : <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) f] Recreation(RC) Industrial/Commercial(IC) <br />? Developed WaterResources(WR) Solid Waste Disposal(WD) <br />13. Primary present land use check one : <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />Developed WaterResources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): A slurry wall will be installed, <br />site will be dry mined via a truck/shovel operation <br />15. On Site Processing: Z Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Same as #14 above <br />• <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: None will be <br />on site or used <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />NA <br />0