My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-21_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2010-10-21_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:05 PM
Creation date
10/22/2010 2:00:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
10/21/2010
Doc Name
Seneca II-W SL-03 Inspection Memo
From
Jim Stark
To
Dan Mathews
Type & Sequence
SL3
Email Name
DTM
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
elevation in the as-built channel as compared to the designed channel due to the change <br />in channel location. This makes for a slightly steeper as-built channel versus the <br />designed channel in this location. The following chart shows the GPS data for post- <br />mining channel PM-1B. <br /> <br />GPS Height <br />Northing <br />Easting <br />Z Corr. <br />Correct Z Exh D <br />Elev. <br />Z Diff. Exh 20- <br />5.9 <br />Station <br />7659.3 4468852.3 309754.5 40.620 7699.951 7700 0.049 7711 0+00 <br />7722.8 4468784.6 309809.5 40.620 7763.400 7764 0.600 7767 2+85 <br />7761.8 4468736.1 309850.9 40.620 7802.403 7804 1.597 7807 4+95 <br />7844.5 4468705.1 310004.2 40.620 7885.148 7888 2.852 7891 10+08 <br />7953.0 4468749.9 310135.3 40.620 7993.639 7996 2.361 7998 14+63 <br />7993.3 4468779.2 310186.5 40.620 8033.872 8036 2.128 8040 16+56 <br />- Channel PM-1 C runs on the south side of channel PM-1 in basically a northwest <br />direction along the disturbance boundary and intercepts channel PM-1 at approximately <br />station 4+86 (on the Division's channel profile). The channel has an as-built length of <br />approximately 501 feet compared with a design length of approximately 376 feet. The <br />channel design specifies a bottom width of 3 feet, an overall depth of 0.8 feet and a lining <br />TRM. The observed channel bottom width was between 4 and 6 feet, its depth was <br />between 3 and 5 feet and its lining was TRM. The as-built channel location is basically <br />the same as the designed channel location with the exception that the as-built channel is <br />approximately 125 feet longer than designed channel. The channel was very well <br />vegetated and there were no erosional problems noted. The as-built channel profile for <br />the lower 300 feet of the channel (where there is a design profile) is between 14 and 40 <br />feet higher than the design. This is a result of a slight variation in the post-mining <br />topography and the change in the alignment of the lower portion of the channel. The <br />overall grade of the lower portion of the channel is not affected. The following chart <br />shows the GPS data for post-mining channel PM-1C. <br /> <br />GPS Height <br />Northing <br />Easting <br />Z Corr. <br />Correct Z Exh D <br />Elev. <br />Z Diff. Exh 20- <br />5.9 <br />Station <br />7423.4 4468756.9 309421.8 40.620 7464.011 7466 1.989 7457 0+00 <br />7445.8 4468735.5 309446.9 40.620 7486.438 7490 3.562 7472 1+09 <br />7465.7 4468710.4 309492.9 40.620 7506.333 7508 1.667 7500 2+81 <br />7522.4 4468709.6 309560.1 40.620 7563.016 7562 -1.016 5+01 <br />- Channel PM-2A runs on the west side of the disturbed area basically in the middle of <br />the Seneca II-W South area and flows basically from south to north, discharging into <br />Pond 016A. The as-built channel is approximately 2,730 feet long compared with a <br />designed length of approximately 2,680 feet. The channel design specifies a bottom <br />width of 3 feet, an overall depth of 1.25 feet and a lining of either 6 inch riprap or TRM. <br />The observed channel bottom width was between 3 and 10 feet, its depth was between 1 <br />and 3 feet and its lining was 9-12 inch riprap and TRM (depending on the location). The <br />as-built channel was generally between 25 to 150 feet west of the designed location but
The URL can be used to link to this page
Your browser does not support the video tag.