Laserfiche WebLink
PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />INSPECTOR'S NAME: Dennis Jones <br />NPDES I.D. NO.: N/A <br />FACILITY CONFIGURATION: <br />SITE NAME: Pond #016A <br />MINE NAME: Seneca II-W Mine (Seneca Coal Cc) <br />MINE I.D. NO.: CMLRD Permit No. C-82-057 <br />DATE: q `a - l 0 <br />DATE LAST INSPECTION: 6-9 -10 <br />LOCATION: NE1/4 SEl/,, Sec. 27, TSN, R88W <br />LOCATION: 8 mi. S of Hayden, CO <br />OWNER'S REP.: Roy Karo, Gen Mgr <br />Circle or write in appropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil: Yes <br />2. Lift thickness: in. <br />3. Compaction according to approved plan: <br />4. Burning (specify extent and location): No <br />5. Angle of slope: 3:1 upstream, 3:1 downstream Total = 6:1 <br />6. *Seepage (specify location, color, and approximate volume) <br /> From underdrain pipes: N/A <br /> At isolated points on embankment slopes: Yes o N/A <br /> At natural hillside: Yes No N/A <br /> Over widespread areas: Yes No N/A <br /> From downstream foundation area: O 6 Yes No N/A <br /> "Boils" beneath stream or ponded water: Yes No N/A <br />7. Cracks or scarps on crest: Yes No N/A <br />8. Cracks or scarps on slope: Yes No N/A <br />9. Sloughing or bulging on slope: Yes No N/A <br />10. *Major erosion problems: Yes No N/A <br />11. Surface movements in valley bottom or on hillside: gee Si Yes No N/A <br />12. *Erosion of toe: Yes o N/A <br />13. *Water impounded against toe: Yes [No N/A <br />14. Existing embankment freeboard: (normal = 5.41, 2008) feet <br />15. Increase Decrease in water level: Itia Cl?oe ti. q feet <br />16. Cracks, bulging, or erosion on upstream face: Yes io N/A <br />17. Visible sumps or sinkholes in slurry surface: N/A <br />18. *Clogging <br /> <br /> Spillway channels and pipes: Yes o) N/A <br /> Decant system: N/A <br /> Diversion ditches: N/A <br />19. *Cracking or crushing of pipes <br /> Spillway pipes: Yes No N/A <br /> Decant system: a <br />20. Trash racks clear and in place: &e <br />s) No N/A <br />21. Discharge rate (gpm) 12 <br />*Major adverse changes in these items could cause instability and should be reported to the <br />Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions noted in <br />these items should normally be described (extent, location, volume, etc.) in the space on the <br />back of this sheet. <br />Cross-Valley Pond