My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-22_REVISION - C1981010 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2010-10-22_REVISION - C1981010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:26:08 PM
Creation date
10/22/2010 10:32:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
10/22/2010
Doc Name
2010 Midterm Review with Cost Estimate Responses
From
Jason Musick
To
Rob Zuber
Type & Sequence
MT6
Email Name
JDM
RDZ
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />DIRECT COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 04-Mar-2010 Permit or job no. C-1981-010 Site : Trapper Mine <br />User : JDM Abbreviation : none State :Colorado <br />Task : OOA Filename : C010-00A County :Moffat <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or job action :2010 Midterm Review <br />Task description : Summary of Regrade Tasks <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Ash Disposal Pit Regrade (West) dozer 5 62.1 $103,886 <br />002 -Ash Disposal Pit Regrade (North) dozer 4 65.6 $87,843 <br />003 -Ash Disposal Pit Regrade dozer 1 53.81 $17,988 <br />004 -DIE Pit Regrade (Spoil East Side) dozer 8 108.5 $290,348 <br />005 -DIE Pit Regrade (West) dozer 6 147.1 $295,186 <br />006 -F Pit Regrade (Highwall Side) dozer 9 253.7 $763,344 <br />007 -F Pit Regrade (Spoils Side 1) dozer 9 23.0 $69,315 <br />008 -F Pit Regrade (Spoil Side 2) dozer 9 439.6 $1,322,747 <br />009 -Z Dip Pit Regrade (Highwall Side) dozer 3 135.07 1 $135,454 <br />010 -Z Dip Pit (Spoil Side) dozer 3 410.3 $411,530 <br />011 -East A Pit Regrade (East Side) dozer 4 94.1 $125,927 <br />012 -East A Pit regrade (West Side) dozer 4 195.9 $262, 038 <br />013 -K-Pit Regrade dozer 10 314.7 $1,052,058 <br />014 -G Dip Pit West Regrade (Post Side) dozer 7 70.6 $165,419 <br />015 -G Dip Pit East (Post Side) dozer 7 53.6 $125,561 <br />016 -G Dip Pit Middle (Post Slide) dozer 5 172.5 $288,431 <br />020 -Cast Blast F-Pit Dipline (Highwall) blasting 4 233.7 $117,742 <br />021 -Cast Blast Z-Pit (Highwall) blasting 4 82.8 $41,761 <br />022 -Cast Blast East A-Pit blasting 4 172.1 $89,887 <br />023 -Cast Blast K-Pit blasting 4 194.7 $98,121 <br />025 -K-Pit Regrade TrucWLoader truckl 8 6,146.21 $7,274,805 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 9,430.81 $13,139,391
The URL can be used to link to this page
Your browser does not support the video tag.