Laserfiche WebLink
At present there is excess treatment capacity of the water treatment system. Cotter is proposing <br />to install additional sumps to intercept alluvial groundwater. It is expected that even one <br />appropriately located sump will produce a measurable impact on stream water quality. <br />Cotter will be working with the Division of Reclamation, Mining and Safety staff to accomplish <br />the changes necessary to install and operate additional sumps at the Site with a goal of capturing <br />additional targeted alluvial groundwater and treating such water as soon as possible. <br />4