Laserfiche WebLink
and (5) revegetation. If any of the above mentioned critical construction periods do occur but they are <br />not covered by the quarterly inspection reports, then additional reports are required. <br />If you have any questions feel free to contact me. (303) 866-3567, extension 8113. <br />Sincerely, <br />r <br />r4y ': ? <br />Robert Zuber, P.E. <br />Environmental Protection Specialist