Laserfiche WebLink
Peabody <br />Twentymile Coal Company <br />Mr. Jason Musick <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />(303) 866-3567 X8134 <br />29515 Routt County Road #27 <br />Oak Creek, CO 80467 <br />970.879.3800 <br />October 13, 2010 <br />RE: Twentymile Coal, LLC - Foidel Creek Mine (Permit No. C-82-056), Technical Revision <br />(TRO10-76) for Ditch G6 Extension <br />Dear Mr. Musick: <br />Twentymile Coal, LLC (TC) requests CDRMS approval of a Technical Revision (TRIO-76) to the <br />approved Permit, for installation, operation, maintenance, and reclamation of an extension of the existing <br />discharge ditch for Pond G, to route discharge flows around an existing wet area to the existing road <br />culvert under Routt County Road 27 (RCR27). Presently, the pond discharge spreads-out into a low area <br />on the south side of the existing UPRR rail-spur, which naturally drains to the existing road culvert. With <br />installation of the 6RT Thickener Underflow Borehole and Pipeline (TR09-69), it is desirable to drain the <br />low-lying wet area to facilitate pipeline installation, ongoing inspection and monitoring, and any <br />necessary future maintenance activities. The proposed ditch extension will be a 450 foot long trapezoidal <br />ditch approximately 1.5 feet deep, with an 8 foot top width. The ditch bottom will be over-excavated and <br />re-compacted, in order to minimize infiltration. The location and configuration of the proposed Ditch G-6 <br />Extension is shown on Map 24, Surface Facilities and Freshwater Systems. SEDCAD+ design <br />calculations are provided in Exhibit 8J, CYCC Pond G - Stage Storage. <br />Installation of the proposed Ditch G-6 Extension will involve the following: <br />? Placement of straw wattles downgradient of the ditch construction area <br />? Removal and temporary windrowing of soil material and vegetation on the upgradient side of the <br />ditch construction area <br />? Construction of the ditch, including over-excavation and re-compaction of the ditch bottom <br />? Replacement of soil material and vegetation on the ditch area <br />? Connection of the ditch ends to the existing ditch and road culvert <br />TC plans to initiate ditch construction immediately on receipt of the required permit approval, and <br />anticipates that ditch construction can be completed in a relatively short timeframe (7-10 days). Given <br />that there is little or no discharge from Pond G at this time of year, and the current drainage configuration, <br />any minor discharge from Pond G during construction will continue to be routed through the low-lying <br />area to the existing road culvert. In addition, given the short duration of construction, recovery and <br />replacement of soil and vegetation should result in effective revegetation of the ditch construction area. <br />If, following the first growing season after completion of construction, revegetation is not adequate, TC <br />will complete supplemental reseeding, as necessary. <br />C:\Documents and Settings\ahd\Local Settings\Temporary Internet Files\Content.Outlook\3Q03WBR1\TR10-76 Ditch G-6 <br />Extension TL.doc