Laserfiche WebLink
September 20, 2010 C-1994-082/Yoast Mine DTM <br /> 920.TRM channel gully repair:upper YPM I-I. 0/20. Healing crack/sagebrush grass stand YPM 1-1 <br /> watershed;slope north of Shrub Site SP06-I. <br /> 9/2 . Temporary scraper route,upper YPM-7 drainage. 9/20. Pond 12 slide remediation site from cutslope crest. <br /> Sh ep flock in distance,across YPM 6-2. <br /> W-�17W A <br /> 9120.Pond 12 slide cut slope. 9/23. Pond 12 slide repair from Pond 12A vicinity. <br /> Number of Partial Inspection this Fiscal Year: 2 <br /> Number of Comolete Inspections this Fiscal Year: 1 <br /> Page 11 of 13 <br />