Laserfiche WebLink
IXBOW ENGINEERING INSPECTION <br />EAST YARD, WEST VALLEY FILL AND H WEST <br />COAL MINE WASTE DISPOSAL PILES <br />The approved Oxbow Mining, LLC (OMLLC) Mine permit includes a requirement for quarterly inspections of <br />coal mine waste piles for stability. The inspection is to be performed by a registered engineer or other qualified <br />professional specialist, who is experienced in the construction of earth and rockfill embankments. On September <br />27, 2010 visual inspections were performed of the East Yard, West Valley Fill and II West coal mine waste <br />disposal areas. Four successful compaction tests were performed during the quarter on July 20, 2010. Copies of <br />the tests are attached herein for the Division's information. <br />EAST YARD - The East Yard disposal area has reached its design capacity, and no new waste material has been <br />placed since June of 2001. The revegetated slope was inspected for signs of erosion or instability. No erosional <br />features were noted on the slope. The covering of the waste pile is considered complete. Nothing was observed <br />during the inspection that would indicate the pile has a potential for structural failure. <br />WEST VALLEY FILL - During the first quarter, no waste was hauled to the West Valley Fill area. The <br />elevation of the waste pile was surveyed at the approximate 6229.7' elevation. The active waste storage area <br />will continue to be an interim storage area for refuse rehandled to II West at a later time. <br />The revegetated outslope located between the fill slope toe to the approximate 6200' elevation was inspected for <br />signs of erosion and instability. No erosional features were noted on the slope. The third bench (approximate <br />6200' elevation) setback remains established for the fmal lift of waste material and the ramp constructed on the <br />waste pile to provide access to the II West Coal Refuse Facility light use road and haul road. These two roads <br />continue to be utilized. No springs or seeps were noted. The slope was checked for noxious weeds. Surface <br />drainage control features are performing according to the plan. Nothing was observed during the inspection that <br />would indicate the West Valley Fill has a potential for structural failure. <br />II WEST - The II West disposal area received approximately 4510 CY of additional coal mine waste material <br />during the third quarter of 2010. The elevation of waste material is at the approximate 6113.4' elevation. The <br />material has been worked to meet compaction requirements. The 2009 outslope area seeded on November 19, <br />2009 appears stable with good initial seedling response, and no rills or gullies. The seeded area was checked for <br />noxious weeds. No springs or seeps were noted. Surface drainage control features are performing according to <br />the plan. A portion of the East Surface Rock Channel is temporarily covered with fabric and road materials while <br />being used as an access ramp to the pile. Nothing was observed during the inspection that would indicate the II <br />West Fill has a potential for structural failure. <br />nspected by James . Kiger <br />No. 14726 <br />Somerset, Colornrio 81434 USA <br />TEL (970) 929-5122 • FAX (970) 929-5177