My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-18_REPORT - C1981019 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2010-10-18_REPORT - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:56 PM
Creation date
10/18/2010 10:39:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REPORT
Doc Date
10/18/2010
Doc Name
3rd Q 2010 Fill Report
From
Colowyo Coal Company
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South Taylor Fill Inspection Certification <br />On September 22, 2010, 1 inspected the area in which the South Taylor Excess Spoil Fill is being <br />constructed. This report covers activities associated with the East Taylor Fill and the West Taylor <br />Fill identified on Map 23A of the approved permit. The purpose of this inspection was to observe <br />status of the fill placement. This inspection is necessary to satisfy the requirements of CDMG Rule <br />4.09.10 (1 a) and Rule 4.09.1 (1 b). <br />A-A' Underdrain Area: Bower Bros. has completed construction on the entire A-A' underdrain <br />including fabric installation. The uppermost portion of the drain remains uncovered while the central <br />portion has been covered with fill. The lowermost portion of the drain has been covered to within <br />100 feet of the inlet of the West Taylor pond. Fill placement continues. <br />B-B' Underdrain Area: Underdrain construction is completed and all portions of the drain have <br />been covered. Fill placement continues. As of the most recent topographic data (May, 2010), <br />substantial quantities of fill have been placed over the drain. <br />C-C' Underdrain Area: Underdrain construction is completed and all portions of the drain have <br />been covered. Fill placement continues. <br />Design requirements for the spoil pile are addressed in Volume 13, Exhibit 21, Item 1, Introductory <br />Letter. Inspection requirements during construction are further detailed in Volume 12, Section 4.09. <br />1 am a Registered Professional Engineer in the State of Colorado and a representative of <br />Environmental Solutions, Inc, P. O. Box 2996, Cheyenne, Wyoming. Being familiar with the <br />Colowyo operation and the coal program permitting process in Colorado, the construction activities <br />related to the East Taylor Fill are in conformance, to the best of my knowledge and experience, as <br />specified in the Introductory pages and the associated report found in Volume 13, Exhibit 21, Item 1 <br />and other applicable requirements of the approved permit documents, a portion of CDMG Permit C- <br />81-019. <br />0?:. SC PEjF;S? <br />S ` ,32/257 z S <br />/o • ??v <br />SO, <br />NAL <br />No. 32257 <br />lv? r <br />xc: Mr. Kurtis Blunt, Colowyo Coal Company, L.P. <br />cf 17.15.1 <br />cf 24.20 (South Taylor Fill)
The URL can be used to link to this page
Your browser does not support the video tag.