Laserfiche WebLink
Mermo to PCPs <br />Re. SUP No 1999-002 <br />September 13, 1999 <br />Page 19 <br />PARKING REQUIREMENTS <br />An 'Off-Street Parking Plan meeting the standards of Section 30 of the Zoning <br />Resolution "(refer to 30(k) for plan detail) will need to be submitted, epproved, and <br />implemented prior to authorization for a Certificate of Occupancy. <br />SECTION 30 - OFF-STREET PARKING STANDARDS <br />(a) PURPOSE. These standards are designed to lessen congestion in the streets, <br />by requiring the owners and operators. of land, structures and uses to provide off- <br />street parking for their residents, employees, customers clients, patients, and <br />other visitors. ` :However, nothing in these regulations shall be deemed to deprive <br />such owners or operators of the right to maintain control overall such land and <br />structures. The off-street parking requirements herein contained shall apply to <br />the following activities which occur after the enactment of these regulations: <br />newly constructed buildings and newly established land uses; <br />• existing buildings which are expanded by an addition thereto; <br />• change in land use which generates a need for an increase in the required <br />minimum of off-street parking spaces set forth in,(b) below; and <br />• expansion of a land use which generates a need for an increase in the required <br />minimum of off-street parking spaces as set forth. in (b) below. <br />The regulations in this section shall apply to all parking spaces, lots, garages, buildings <br />or portions thereof to be provided in. meeting the requirements of this Zoning <br />Resolution. <br />(b) SPACES REQUIRED <br />1. The folJowina are the minimum required off-street parking spaces. The <br />owners and operators are encouraged to research the parking needs of <br />the same or similar uses they intend for the land and building to insure <br />sufficient off-street parking. _ <br />Based upon the information contained in the application materials, it <br />appears the facility will require approximately 90-120 full-time employees <br />over three shifts of operation. Parking for Industrial land uses and <br />manufacturing facilities is calculated according to 1. space per 2 main-shift <br />employees. The applicant indicated the main-shift workforce will consist <br />of 60 employees thus the facility will require a minimum of 30 spaces <br />including 2 handicapped spaces (of which 1 must be van accessible).